Domestic House pitched roof extension Construction Project

Groundworks & Foundations
  • Trench or raft foundations
  • Damp-proof membrane and concrete slab
Wall Construction
  • Match brick/blockwork to existing structure
  • Cavity insulation required
Roof Construction
  • Pitched roof frame using timber
  • Install breathable felt and battens
  • Tiled/slate roofing installed
Windows, Doors, and Openings
  • Glazing to meet energy efficiency
Internal Works
  • Under floor heating system fitted
  • Insulation, first fix (electrics/plumbing)
  • Plastering and second fix
  • Finishes and decoration

Final Inspection
Building control issues a completion certificate as everything meets standards -Job Done!

Project information

  • Category Construction-Remodeling
  • Client OLB
  • Project date 2024
  • Project Timeline 6 weeks